SCWR 510/511
- Project Submission:
- Projects are filmed during class time on Mondays/Tuesdays
- 2 projects per section film each week.
- Projects film Week 7 through Week 14.
- Before filming, students will submit their project on SFTV On Tap at least 8-days in advance for approval.
- Once a project is approved, students can submit for On Campus permits. Permits must be submitted on Mazevo 5-days in advance.
- Locations:
- Only 2 locations can be used per project. We encourage students to consider using the following locations:
- Interiors Playa Vista Campus – (not submitted via Mazevo)
- Flexible Studio Space – this curtained area has light set dressing of Living Area, office, bedroom)
- PVC 222 – (Classroom reserved for 510/511)
- PVC 286 – (Blackbox reserved for 510/511)
- All other spaces at PVC require a permit through Mazevo.
- Interiors Westchester
- These spaces require a permit through Mazevo. Pictures can be found in the Locations Directory.
- Seaver 202
- Seaver 216
- Seaver 223
- Exteriors Westchester
- These spaces require a permit through Mazevo. Pictures can be found in the Locations Directory.
- Bluff (OMA Bluff) – This is near the O’Malley Apartments.
- HFP Outside Patio
- Interfaith Garden
- Sculpture Garden
- Interiors Playa Vista Campus – (not submitted via Mazevo)
- Only 2 locations can be used per project. We encourage students to consider using the following locations:
- Equipment:
- Faculty/T.A.s will notify Lighting & Grip of location of filming and enter student projects in the 510/511 schedule.
- PVC Interior Equipment: Diva, stand and sandbag
- Westchester Interior or Exterior Equipment: Flex Fill and Sandbag