SCWR 510/511

SCWR 510/511

  • Project Submission:
    • Projects are filmed during class time on Mondays/Tuesdays
    • 2 projects per section film each week.
    • Projects film Week 7 through Week 14.
    • Before filming, students will submit their project on SFTV On Tap at least 8-days in advance for approval. 
    • Once a project is approved, students can submit for On Campus permits. Permits must be submitted on Mazevo 5-days in advance. 
  • Locations:
    • Only 2 locations can be used per project. We encourage students to consider using the following locations:
      • Interiors Playa Vista Campus – (not submitted via Mazevo)
        • Flexible Studio Space – this curtained area has light set dressing of Living Area, office, bedroom)
        • PVC 222 – (Classroom reserved for 510/511)
        • PVC 286 – (Blackbox reserved for 510/511)
        • All other spaces at PVC require a permit through Mazevo.
      • Interiors Westchester
        • These spaces require a permit through Mazevo. Pictures can be found in the Locations Directory.
        • Seaver 202
        • Seaver 216
        • Seaver 223
      • Exteriors Westchester
        • These spaces require a permit through Mazevo. Pictures can be found in the Locations Directory.
        • Bluff (OMA Bluff) – This is near the O’Malley Apartments.
        • HFP Outside Patio
        • Interfaith Garden
        • Sculpture Garden
  • Equipment:
    • Faculty/T.A.s will notify Lighting & Grip of location of filming and enter student projects in the 510/511 schedule.
    • PVC Interior Equipment: Diva, stand and sandbag
    • Westchester Interior or Exterior Equipment: Flex Fill and Sandbag